Project Description

INDUSTRIAL BUILDINGS AND OFFICES IN MONTMELO: Construction of two semi-detached industrial buildings for High Risk 8. Total built area of 12,917 m². Construction with prefabricated concrete structure and enclosures. TPO deck roofing. Warehouse area 9,748 m2, available office area 894 m2, mezzanine storage area 900 m2, perimeter development and loading docks. Technical annex building and 500,000-liter water tank for CI.

MCK is acting as Project Manager (PM) in the project and construction phase and is contracting builders on a package basis for the client COMINVEST SL and under the construction of NADICO. With an investment of €9 million.